FAQs
RESOLVING AN ILLEGAL CONVERSION VIOLATION
The creation of one or more illegal housing units without authorization from the Department of Buildings is a serious offense of the New York City Building Code. Illegal conversions reduce the quality of life in neighborhoods by enabling more people to live in an area than was originally intended. Unplanned growth causes a severe strain on local public services that results in the overcrowding of schools, public transportation and sewer and sanitation systems. It also creates parking problems.
The most serious aspect of this illegal construction is that often it creates substandard, potentially dangerous housing. This can, and has, led to tragic results. The Department of Buildings Quality of Life Task Force investigates complaints of illegal housing. This notice describes what to do if you receive a violation(s) for an illegal conversion.
WHAT IS AN ILLEGAL CONVERSION?
An illegal conversion is the creation of a housing unit(s) without first receiving the approval of, and permits from, the New York City Department of Buildings. Often, it involves the alteration or modification of an existing one- or two-family home by adding an apartment in the basement or attic. Sometimes, an illegal rooming house has been created in a building that was intended to be a one-family house.
WHY IS THIS ILLEGAL?
Some of this housing is illegal because it violates the zoning regulations for the area. In other circumstances, the house itself was not constructed for the current use, and cannot safely accommodate all the people in residence.
WHAT ARE THE CIVIL PENALTIES FOR EACH VIOLATION?
The penalty for a first offense violation ranges from $250 – $2,500 (You are also subject to a $50 per day penalty for each illegal unit for a maximum of 45 days). At the hearing, the judge reviews all the evidence, adjudicates the case and may impose civil penalties. Failure to attend the hearing (defaulting) automatically results in the maximum penalty.
WHEN MUST THE VIOLATING CONDITION BE CORRECTED?
Steps to correct the illegal condition must be taken immediately, upon receipt of the violation. Failure to correct the condition will result in continuing per day penalties.
HOW DOES THE VIOLATION GET RESOLVED?
Payment of a fine is not enough to get a violation resolved. You also must show that the violating condition is fixed. YOU MUST SUBMIT PROOF OF CORRECTION. PHOTOS AND MASTER PLUMBER’S BILLS.
Illegal Conversion Violations May Be Corrected in One of Two Ways
- Remove the illegal condition. The altered spaces must be restored to their prior use or layout. This may require the removal of partitions, plumbing fixtures, gas lines and entrances. All tenants in the illegal units must leave. A Master Plumber must be contracted to cap and remove gas, water and waste lines and fixtures.
- If possible, legalize the additional housing unit(s) by following the guidelines below and obtaining a new Certificate of Occupancy (C of O) from the Department of Buildings. The C of O is a document that describes what the City law says your building is, for example, a one-family home, a two-family home or a 10-story apartment building.
Legalizing Additional Housing Units
First, it must be determined if your property is zoned for multiple housing units or apartments. Some areas are not. In that case, the extra housing unit(s) cannot be made legal under any circumstances. The building’s structure is also important. Because of fire safety concerns, a wood frame house cannot be converted to multiple housing units. IF YOU CANNOT LEGALIZE THE OFFENDING CONDITION, YOU MUST STOP THE IMPROPER USE AND RESTORE THE PREMISES TO ITS PRIOR LEGAL LAYOUT.
If the zoning is okay, then you must hire a New York State-licensed registered architect (R.A.) or professional engineer (P.E.) to prepare design drawings and submit an alteration application to the Department of Buildings on your behalf. There is a filing fee, based on the scope of the work. There is also a penalty for legalization — on a one or two family home; it is two times the cost of the filing fee. After the Department approves the application, you obtain a permit to legalize the existing conditions. If plumbing or electrical work was done, you must hire a NYC-licensed Master Plumber and/or electrician to verify that the work meets the standards of the Building Code. You then can request that the Department issue a new Certificate of Occupancy (C of O). Department inspectors will check your building to make certain that it conforms to the plans submitted by your architect or engineer. If it does, the Department will issue a new Certificate of Occupancy describing the present status and legal use of the building.